Hangars and Industrial Buildings at Alliance, Fort Worth

Runway length decides who can base an aircraft at Alliance, and the hangar decides what they can do with it once it is there. We build clear-span steel hangars and aviation support buildings in and around the AllianceTexas area north of Fort Worth, where the airport has two concrete runways of about 11,000 feet. Business aircraft owners, charter operators and maintenance firms want a door tall enough for a tail, a floor that holds the weight, and a building they can lease or own.

AllianceTexas is a 27,000-acre master-planned development that its developer says has generated more than 73,000 jobs and an estimated $142.9 billion in regional economic impact, with industrial, logistics, corporate office, retail, aviation and multifamily uses. Treat those figures as the developer's own claim. What matters to a building owner is the mix: a place where hangars, distribution buildings and offices share the same infrastructure.

Fort Worth Alliance Airport opened on December 14, 1989, covers 1,198 acres, is owned by the City of Fort Worth and is managed by a subsidiary of the developer. That structure matters because land and leases follow the developer's rules.

Hangars with the right door

A hangar starts with the largest aircraft you expect to house. From its wingspan, tail height and turning radius, we size the opening, then the clear span, then the eave. Doors come in bifold, hydraulic and sliding types; each has a different cost, speed and maintenance profile, and we compare them in the quote. See overhead hangar doors for the options.

Floor slope for drainage, fire separation, fuel and paint storage, and a conditioned office are the other items to settle. Our aircraft hangar page describes the details. For a fleet operator, we also design multi-bay hangars where one frame covers several aircraft and a shop.

Developer, airport and city rules

Building in a master-planned airport district adds layers of review. The developer may have design guidelines for materials, colors, landscaping and setbacks. The airport has height, lighting and operational restrictions. The city has its building code and permit process. We gather all three at the start and merge them into one list so the drawings pass the first time.

The city building department reviews the permit set, so we confirm which requirements currently apply. For a ground lease, the lease itself may have construction requirements and end-of-term obligations. We read those with you, because the building's life and the lease term should match.

Cargo, helicopters and maintenance

The airport hosts a regional sorting hub for a package carrier, a cargo operator's hub that opened on October 2, 2019, and a helicopter manufacturer's customer acceptance center. Those operations create a ring of support users: ground-handling firms, aircraft maintenance, parts distributors, charter operators and equipment suppliers. They want buildings that are fast to deliver and flexible inside.

We cover the industry in more detail on our aviation page, and the logistics side on warehousing and distribution. For a user that does both, such as a parts distributor with a hangar, a combined hangar-and-warehouse frame can be a good value.

Distribution and light industrial shells

Away from the runway, the district is full of distribution space. A steel shell can serve a small distribution user, a truck service operator or a contractor, with dock doors on one side and a truck court. We design to the fire code, sprinkler demands and racking heights and pay attention to the slab, which must carry forklifts and racking.

Our warehouse metal shells are offered with insulated panels or a vinyl-faced blanket. For tenants with a front office, we frame it and run the finishes. The same crews that erect a hangar frame a warehouse, so the quality is consistent, and we can bring a second crew to a large building when the schedule needs it.

Design before dirt

The cheapest changes happen on paper. On an airport-district job, we hold a design meeting with you, the developer's design reviewer and the airport manager before the drawings are final. We confirm door size, height, setbacks and finishes, then freeze them. Changes after the steel is ordered are costly, and we would rather talk for two hours now than reorder a column later.

We also look at the foundation early. The anchor bolt plan, the slab thickness and the door track embeds all depend on the structure, and the slab contractor needs a clear set of drawings. We hold a pre-pour meeting at the site where the slab foreman, the steel erector and our lead walk the layout together.

Cost drivers on a hangar

The door is often the single biggest line after the frame. A large hydraulic or bifold door can cost as much as a small building. Next comes the floor: a hangar slab is thicker than a warehouse slab, with a slight slope to drains and sometimes a sealed finish. After that, heating and insulation, if you want a comfortable work space, and fire protection that may include foam or sprinklers depending on size and use.

Ground lease terms affect value too. If you do not own the land, a building with a short remaining lease is worth less. We help you compare the cost of the building with the lease term so you can see the real annual cost.

Dates that matter on an airport

Work near an active airfield has constraints: crane height approvals, restricted areas and security badging for workers. We plan these items early, because a crane on a hangar site may need coordination with the airport and an aeronautical review. Steel deliveries travel on roads shared with other tenants, and we schedule them to avoid peak times.

Neighbors

Owners at Alliance often compare it with the work in Fort Worth, where several other airfields are inside the city, and with the DFW Airport area. We can price a hangar in each so you can weigh lease terms against construction cost.

Discuss an Alliance-area building

Tell us whether the building is a hangar, a shop or a distribution space, and what ground lease or parcel terms you are working with. We will return a concept, a price per square foot and a schedule.

Common Questions

Who approves a hangar design at Alliance?

Usually the developer, the airport manager and the city, each with different concerns. We assemble their requirements early and prepare one drawing set that addresses all of them.

What door type should I choose?

It depends on size, budget and how often the door is used. Bifold and hydraulic doors are common for large openings. We compare cost, speed and maintenance.

Can the same company handle a hangar and a warehouse?

Yes. The frames are similar, with different doors, floors and fire requirements. We build both.

Do I need special approval to use a crane near the runway?

Often yes. Crane height can require review by the airport and aviation authorities. We plan for it in the schedule.