Multifamily and Mixed-Use Support Buildings in Texas

Apartment buildings are not our product, and a developer who needs a four-story wrap or a podium over structured parking should hire a builder who does that every day. What we do build is the half of a multifamily or mixed-use community that sits around the residential blocks: the clubhouse and fitness center, the leasing and management office, the maintenance shop and parts storage, the detached garages and carports, the resident storage building, the retail pad on the corner and the commercial space that a mixed-use plan requires.

These are single-story or low-rise buildings with open interiors and repeated bays, so they are well suited to a pre-engineered frame, and they are often the buildings that make or break a lease-up schedule. A leasing office has to be open before the first residents can sign. A maintenance shop has to exist before the first work order. A retail pad that sits dark delays the revenue that justifies the mixed-use zoning.

The sections below describe how we work on those buildings in the master-planned and infill markets of Texas.

The buildings around the residential blocks

Amenity buildings come first: a clubhouse with a clear-span great room, a fitness center, a coworking room and a pool equipment building. We frame them with a pitched or low-slope roof, large glazing and an interior finish chosen by the architect. Detached garages and carports are a second line, built as long repeated bays with a shed roof, where the pre-engineered approach is much faster than site framing.

Resident storage buildings are a third. They look like a small self-storage building, which they are; see our self-storage facility page for the layout logic. Build-to-rent communities of small detached homes, workshop-and-live product and flex units with an office up front and a bay behind are a growing category as well, and our flex building experience applies.

Phasing around residents and neighbors

The hard part of a multifamily site is that it is occupied while it grows. Phase one residents live a few feet from the phase two excavation. We schedule noise and deliveries to the community's rules, keep fire lanes and resident parking open, and fence the work area. Dust control and daily cleanup are part of the contract, because a bad review from a resident turns into a leasing problem.

Utilities and drainage are the other coordination point. A new building on an existing community ties into water, sewer, power and storm lines that serve occupied units, and we plan outages with the property manager and give residents notice. Roof drainage from a clubhouse or garage block feeds a detention system that the civil engineer sized for the whole site, so we coordinate downspout locations early. Our anchor bolts and foundations page covers the footing work.

Mixed occupancies and the fire separations between them

A mixed-use building contains more than one occupancy, and the code forces separation: a fire-rated wall or floor between residential and retail, separate egress, and sprinkler design that covers both. If a retail or office component is attached to apartments, the review is more involved than for a stand-alone building, and the design team has to show the separations in the drawings. Texas makes the International Building Code the municipal commercial baseline, and each city adopts amendments by ordinance, so the details vary by city. Dallas lists the International Codes with Dallas amendments.

Residential portions of a community follow the residential code at the municipal level, as the same state statute sets the International Residential Code. Accessibility registration with TDLR applies to commercial portions with a total estimated cost of $50,000 or more. We build the commercial and amenity buildings and coordinate with the residential builder and the architect for the shared items.

Commercial space, pads and the retail ground floor

Master-planned places often require commercial space as part of their entitlements. Irving's Las Colinas is a planned, mixed-use community of more than 12,000 acres near the SH 114 and Bush Turnpike interchange, and the DART Orange Line runs through it to DFW Airport. Pearland's Lower Kirby District is a 1,200-acre mixed-use district off Beltway 8 and State Highway 288. AllianceTexas in Fort Worth is a 27,000-acre master-planned development with industrial, logistics, corporate office, retail, aviation and multifamily land uses. The Star in Frisco is a 91-acre project that holds a team's headquarters, training facilities and a 12,000-seat arena.

In places like that, the commercial pads need to open while the housing is leasing. We build single-tenant restaurant and service pads, in-line shops and small office buildings on pad sites and in mixed-use blocks, using the methods on our retail shopping center page. The Pearland and Irving pages show the markets in more detail.

Lease-up dates and what they mean for the order

A multifamily owner is watching two dates: the first certificate of occupancy for residents and the stabilization date the lender expects. Support buildings feed both. The clubhouse and leasing office have to be open at first move-in, while the maintenance building and garages come online as the community fills.

We lay out the support buildings in the same release schedule as the residential blocks. Steel is ordered in batches so a garage block can be erected while a clubhouse is being finished, and the crew moves from one building to the next without remobilizing. For a developer building several communities with a repeating prototype, this approach becomes a standard kit. We run the work as design-build and keep the permit and ordering steps on one calendar.

Services used on a community

Carports and garages overlap with commercial metal buildings, which describes roof, wall and trim packages. Clubhouses with large rooms use the same frames as an event hall, and our recreation and sports facilities page describes indoor courts, fitness halls and community rooms in more detail.

For owners with an existing community, we do re-skin and repair of older metal garages and maintenance buildings, which extends their life at a fraction of replacement cost. A worn-out carport roof, rusted trim or a leaking maintenance building can usually be fixed by replacing the panels, flashing and fasteners while the frame stays in place, and the work can be done in sections so residents keep their parking. We inspect the frame first, report what we find honestly and give a price for repair against replacement. Owners with several properties often ask us to survey all of them and rank the work by urgency, which turns a pile of complaints into a capital plan.

Building around a residential community?

Send the site plan and lease-up dates. We will return a building list, frame layouts and a release schedule.

Common Questions

Can you build the apartment buildings themselves?

No. Wood-framed and podium apartment buildings are a different trade. We build the amenity, commercial, maintenance, garage and storage buildings that go with them.

What is a typical clubhouse schedule?

Once site work and permits are done, the frame and envelope take weeks. The interior finish usually takes longer. We schedule the clubhouse first so it can open at the first move-in.

Do carports need a permit?

Yes in most cities, with structural drawings that show wind and snow loads. We provide them as part of the package.

How do mixed-use fire separations work?

The code requires fire-rated walls or floors between residential and commercial occupancies, with separate egress and sprinkler coverage. The architect shows them in the plans and we frame to match.

Can you work on an occupied community?

Yes. We fence the site, coordinate outages and deliveries with the property manager and keep fire lanes open.

Related

Plan Your Building


Tell us about the site, the building and the schedule.

Request a Project Review

Call214-390-3833